Our Mission is to help the engineer, owner, contractor, or private developer design a cost effective yet efficient solution to their water and wastewater problems in municipal, industrial, government, land development, and utility markets. We want to be known as the people that turn any WASTE STREAM into a valuable RECLAIMED RESOURCE.
The S. Roberts Company was formed in 2001 to provide a link between selected manufacturers and the consulting engineers and/or end users in the field of water and wastewater treatment. The principals bring over 50 years of experience in applying product to specific project needs. We have assembled a group of associates that broaden our reach from both a geographical and application standpoint.
Meet the staff of s.roberts company…
October is the month that start up of Phase II of CLCW wastewater treatment plant. Phase II takes the capacity of the plant from 120,000 GPD (ADF) to 360,000 GPD. This was capable by adding two (2) more ZMOD membrane tanks and one (1) more permeate pump skid. The controls for Phase 1 and Phase II were linked together and data made available to the plant SCADA system. The ZMOD (steel membrane tanks) system was selected so that a slab on grade type construction could be utilized and a pole building erected over the Membrane Tanks. Gridor Construction is the contractor on Phase II and Steve Lee is the PM. The consulting engineer is Bonestroo, Karen Cavett. Call Steve Roberts (612-290-5794) or J.R. Yde (605-336-3610) for more information of to arrange a tour.
March 2-4; St Cloud
More...
Oct 20,21,22 - Minot ND
More...
Please use this searchable database
More...
Vibratory Shear Enhanced Processing - Designed for High Solids applications
More...
Sign up for our Email Newsletter